ENCYCLOPEDIA

Many steel enterprises have stopped production for maintenance!

  Since June, the domestic epidemic situation has gradually improved. The pace of resumption of work and production of local steel enterprises began to accelerate, and the number of maintenance enterprises began to decrease gradually. Recently, I have collected the maintenance information of steel mills in a small part of the country since June, which is sorted out as follows:

  Northeast market

  Liaoning Province

  Fushun new iron and Steel Co., Ltd. plans to build a 580m building in the plant from the middle of June ³ The blast furnace will be repaired annually for about 30 days. It is estimated that the daily output of molten iron will be reduced by about 1500 tons, affecting the output of molten iron by about 45000 tons; At the same time, one wire rod rolling line, one full continuous rolling line and one bar repair in turn are expected to affect the coil production of about 50000 tons and the rebar production of about 30000 tons in June.

  Affected by the shortage of molten iron, Benxi Iron and Steel Co., Ltd. plans to stop production for maintenance from June 10 to 15. The impact is expected Φ The output of 30-300 round steel is 10000 tons.
 

  East China market

  Anhui Province

  Masteel plans to stop production and overhaul the 2250mm hot-rolled coil production line for 10 days from June 28, 2022, which will affect the daily average hot-rolled coil output of 12100 tons and the total output of 121000 tons.

  Tongling Fuxin started to overhaul a 1280M building on June 10 due to equipment docking ³ For the blast furnace, the two rolling lines will be shut down for maintenance at the same time. It is estimated that the maintenance time will be 5 days, affecting the output of about 30000 tons in total.

  Shandong Province

  Xiwang special steel overhauled the large bar production line on June 1, and the overhaul duration was to be determined, affecting the output of 130-350mm to 20000 tons.

  Jiangsu Province

  Zhongtian iron and steel overhauled two bar lines in June. The overhauling duration was to be determined, affecting the bar output of 45000 tons.

  Jinhong iron and steel stopped production in the whole plant on June 5 for 15 days, affecting the output of about 45000 tons.
 

  Southwest market

  Sichuan Province

  On June 3, Chengdu Chengshi (plant 512) overhauled an electric furnace. The duration of overhaul was to be determined, and the daily output was reduced by 3500 tons.

  Chongqing City

  Chongqing Iron and steel overhauled the No. 1 converter and continuous caster on June 8, which lasted 20-23 days, affecting the daily average output of hot rolled coil of about 7500 tons.

  According to the overall situation of the steel mills in the three major regions in China, there will be a certain reduction in the output of plates and wires.

2022/06/14 11:25:51 303 Number