SERVICE

Shandong Iron and Steel: Rizhao Co., Ltd. Tender Notice

  To potential bidders:

  Shandong Iron and Steel Group Rizhao Co., Ltd., a subsidiary of Shandong Iron and Steel Group Co., Ltd., is planning to tender and purchase a set of frequency conversion cabinets for the main exhaust fan frequency converter of the iron-making plant. The relevant matters are announced as follows. Potential bidders who meet the conditions are welcome to participate. this tender.
 

  1. Tendering Conditions

  Name of the tenderee: Shandong Iron and Steel Group Rizhao Co., Ltd.

  Tenderee's project name: A set of frequency conversion cabinets for the main exhaust fan frequency converter of the iron smelting plant

  Project funding source: self-raised, project funding ratio: 100%.

  The project has met the bidding conditions, and the project is now open for bidding.

  2. The scope and content of the tender

  1. The scope and content of the tender:

  1.1 Main contents of the project: The original sintering main exhaust fans (4 sets in total, each motor 9500KW) are driven by one-to-one Siemens inverters. Now, a new high-voltage inverter room is built on the original basis, and the first floor is arranged. On the basis, a set of spare frequency converter circuit is added. The frequency converter uses domestic first-line brands, and the two sides of the input switch cabinet are powered by two busbars. At the same time, 8 output switching cabinets are added, and the motor to be driven can be selected through the switching cabinet. When one of the No. 1 to No. 4 inverters fails, it can be quickly switched to the standby inverter to ensure the continuity of production.

  A set of air-water cooling system is configured in the newly added inverter room to ensure that the temperature of the inverter room is less than or equal to 40℃. The user of the circulating cooling water system is the air-water cooling system.

  1.2 Scope of project contract:

  Scope of engineering contract: design, procurement, construction, installation and commissioning, trial operation, completion of functional assessment, personnel training, technical services until completion acceptance of a set of frequency conversion cabinets and related supporting facilities for the main exhaust fan frequency converter of the iron smelting plant, and Defect repair, engineering quality assurance/warranty obligations within the warranty period are turnkey projects throughout the entire process. The general contractor of the project is generally responsible for the design, construction, installation and integration within the scope of the bidding section.
 

  2. Planned construction period: 150 calendar days (the construction period will be calculated after the notification of winning the bid is issued).
 

  3. Place of delivery: Shandong Iron and Steel Group Rizhao Co., Ltd., Lanshan Industrial Park, Rizhao City.

  3. Qualification requirements for bidders

  The qualification review for this tender will be post-trial. If the bidder does not meet one of the following conditions, the qualification review will be rejected and will not enter the next stage of review:

  1. The bidder has the qualification of an independent legal person, and the registered capital is not less than 5 million yuan.

  2. Qualification requirements (1, (2) must have both):

  ⑴ Design Qualification: Have design level B or above in metallurgical industry or design level B or above in electric power industry.

  (2) Construction qualifications: one of the qualifications of level 3 and above for general contracting of construction engineering, level 3 and above for general contracting of mechanical and electrical engineering construction, and level 3 and above for general contracting of metallurgical engineering construction, and a valid safety production license (bidders) The link to the website of the authoritative organization for the qualification and validity period must be provided).

  3. Minimum performance requirements: Bidders must have at least one performance that is the same or similar to this project since 2018.

  4. Accept consortium bidding.
 

  4. Instructions for Bidders

  1. All the performances that meet the requirements since 2018 should be provided in the bidding documents (6 additional copies), and the copies of the project contract with the official seal should be provided for the performance (at least include: the basic information pages of both parties to the contract, the content of the construction work, Contract signature page, contract signing time and contact information of the user, etc.), and the order of providing copies of performance should be consistent with the order of performance list. The above information should be provided with the original contract for future reference when bidding.

  2. It has a good business reputation and a sound financial accounting system. It is necessary to provide the audit report audited by an accounting firm in the past three years (if it has been established for less than three years, the audit report and the latest financial accounting statement, including at least the Financial audit report signature page, balance sheet, cash flow statement, income statement.

  3. Bidders must abide by relevant national laws and regulations, and have no major illegal acts.

  4. When the tenderee uses the services provided by the bidder, there is no known illegal situation, nor any known disputes related to third-party patent rights, copyrights, trademark rights or industrial design rights. If there is any allegation of infringement brought by the tenderee using the services provided by the tenderer, the tenderer shall bear full responsibility in accordance with the law.

  5. The quantity and quality of the effective performance will be converted into the points assigned by the evaluation. If the bidder is lazy in providing it, the score will be affected and the consequences will be at your own risk.

  6. Minimum requirements for project managers: 1 person with a corresponding professional intermediate engineer or above; and shall not be the project leader of other construction projects under construction, and provide bidders who have not less than 3 consecutive months in the past six months. Its social security payment records.

  7. Minimum requirements for the person in charge of design: 1 person, with a corresponding professional title of senior or above, and provide a record of no less than 3 consecutive months of the bidder's social security payment in the past six months.

  8. Minimum requirements for the person in charge of construction: 1 person with a relevant professional title of intermediate engineer or above and a safety production (level B) assessment certificate, and provide the bidders who have paid social security for them for no less than 3 consecutive months in the past six months. Record.

  9. Visit the site

  Due to the impact of the epidemic, no on-site investigation will be organized for the time being.

  If the bidder does not bid or provide information as required by the instructions, the bid evaluation committee will make a review that is unfavorable to the bidder; in order to ensure the fairness and impartiality of this procurement project, the bidder has the right to publicize and accept it in the bid-winning announcement. Social supervision; at the same time, the tenderee has the right to conduct market research, substantive examination and on-the-spot inspection on the authenticity and effectiveness of the above qualifications, performance, supply capacity and other relevant materials, and has the right to void the bidder once it is found that the bidder has committed fraudulent acts. The bid or disqualification of the bid winner will be dealt with seriously in accordance with the relevant laws and regulations and the bidding documents.
 

  5. Announcement and bidding registration time

  March 17, 2022 to March 23, 2022.
 

  6. Submission of bid documents, deadline for bids (bid opening time) and location of bid opening

  1. Deadline for submission of bid documents (called bid deadline and bid opening time):

  At 9:00:00 on April 7, 2022, the bidder should submit the bidding documents before the bidding deadline.

  2. Methods of document submission and bid opening:

  Electronic bidding: Submit electronic bidding documents through the Shandong Iron and Steel Group Co., Ltd. procurement and auction information management platform (http://bams.shansteelgroup.com) (the system automatically feeds back the upload time, and the submission time is the time for the system to report the result.), you can refer to Use the "Help" on the home page of the platform to operate. If you encounter technical problems with the website, please contact the electronic platform at 0531-67606687 or 0633-7920020 in advance.

  If the bidder fails to bid successfully due to failure, it shall be deemed to have abandoned the bid. If electronic bidding is not possible due to special circumstances such as the Internet, with the consent of the tenderee, it can be sent to the mailbox designated by the tenderee before the deadline.

  In this electronic bidding, the bidder does not need to go to the site of the tenderee.

  3. The tenderee will reject the tender documents that are not delivered to the designated location as required or overdue.

  In this tender, one quotation is allowed, and no second quotation is allowed; only one unique quotation is allowed.
 

  7. How to apply for bidding and obtain bidding documents

  This tender is submitted online. All potential bidders who intend to participate should log in during the announcement period: http://bams.shansteelgroup.com. Bidders who participate in the bidding for the first time need to register on the platform. When registering, please refer to the "Use Help" on the homepage of the website. User registration, After the review is successful, you must change the initial password, log in again, and register (only fill in or upload the required fields with red stars when registering, and you can complete the registration. Due to the post-qualification review, after the registration is successful, no review will be conducted). Click to register, the projects that have been successfully registered will disappear, and the system will give a notification of successful registration. Don’t pay attention to the prompts such as “upload performance” and “payment” given by the system. After the bidder pays the bid fee, the tenderee’s finance will confirm within 2 working days. After confirmation, the bidder can directly use the registered account and password to download the bidding documents from the Internet. If you have any questions during the period, please consult 0633- 7920919).

  The bidding fee for this bidding project is 400 yuan. Wire transfer or transfer from the basic account of the bidder to the account of the bidder (see "IX. Account information of the bidder"), and indicate the name or number of the bidding project in the bank remittance or transfer remarks ****; The bidder's name shall be indicated at the same time, otherwise, the tenderee has the right not to confirm, and the consequences arising therefrom shall be borne by the potential bidder.

  The tender fee will only be issued with a receipt and will not be refunded. The receipt should be collected within one month, and no postal service is provided.
 

  8. Bid bond

  Form of bid bond: wire transfer or bank transfer.

  The amount of the bid bond: RMB 30,000 (uppercase 30,000 yuan).

  The bid bond shall be paid by wire transfer or transfer from the basic account of the bidder or other account confirmed by the bidder (accounts not recognized by the bidder, the bidder has the right to cancel the bid) to the bidder's account (details). See "IX. Account Information of the Tenderee"), no receipt will be issued for the convenience of return. And indicate the name of the bidding project **** in the bank remittance or transfer remarks column (if there is a subcontract, the package number must be indicated).

  After the winning bid result is announced, the bid bond of the unsuccessful bidder will be refunded within one month; the bid bond of the winning bidder will be automatically converted into the wage bond of migrant workers. During the period, please refuse to inquire about the refund by telephone; if you have paid the bid bond, but fail to bid for any reason, please send the scanned copy of the bid bond receipt and the reason for return to the email sdgtrz@163.com to inform, and write in the "subject" of the email: Bidding Deposit + **** project + **** unit + contact person + contact information, the tenderee will reply in time after receiving the email.

  After the successful bidder's performance bond is delivered, the performance bond refund application issued by the procurement department will be returned to the financial department (interest-free). (The successful bidder who pays the performance bond shall refer to the performance bond refund procedure for refund).

  After the successful bidder's wage deposit for migrant workers has been delivered and ensured that the wages of migrant workers have been paid in place, the successful bidder will contact the finance department for a refund (interest-free) based on the application for the refund of the wage deposit of migrant workers issued by the procurement department.
 

  9. Account information of the tenderee (account for payment of bid fees and bid bond)

  Account name of the tenderee: Shandong Iron and Steel Group Rizhao Co., Ltd.

  Account Bank: Industrial Bank Co., Ltd. Rizhao Branch

  Account: 523010100100371125

  The payment should indicate the bidding project; otherwise, the tenderee has the right not to confirm, and the consequences arising therefrom shall be borne by the potential bidder.
 

  10. Clarification and Q&A consultation

  1. Before the deadline for bidding, the tenderee has the right to clarify the bidding documents. The clarification documents will be released in the form of attachments on the bidding platform of the tenderee. If the release date is less than 15 days from the deadline for bidding, the bid opening date will be postponed accordingly or the bid opening date will be postponed. After consultation with the bidders, no extension will be made.

  2. If the bidder requires the tenderee to answer questions on the bidding documents, it should submit a clarification email to the tenderee 10 days before the deadline for bidding, and send the clarification document in PDF version and word version to the mailbox at the same time. Clarification should be indicated in the "subject" of the email: clarification + **** project + **** unit + contact person + contact information, if the information is not specified as required, the tenderee has the right to make a document that has not received clarification requirements deal with. The tenderee shall reply 5 days before the deadline for bidding, and the reply does not state the source of the problem.

  3. The clarification of the bidding documents is published on the http://bams.shansteelgroup.com platform. Potential bidders are requested to log in daily with their registered usernames and check whether there are any clarifications or supplementary documents and on-site clarifications in the registered projects. Notification and other information, the tenderee will no longer notify separately, once issued, it will be deemed to be served to all bidders, and the consequences caused by the failure to log in shall be borne by the bidders themselves.
 

  11. Announcement media

  This Bidding Announcement is simultaneously published on "China Procurement and Bidding Network" (http://www.chinabidding.com.cn) and the tenderer's website (http://bams.shansteelgroup.com). If any media other than the above-mentioned media reprints or publishes information related to this tender, the tenderee does not assume any responsibility and reserves the right to pursue the responsibility of the relevant parties.
 

  12. Contact address, contact person and contact information of the tenderee

  Contact address: Shandong Iron and Steel Rizhao Company Office Building (Baidu map available) - Room 301, 3rd Floor, Area A, Dining Center (No. 1, Lingang Road, Donggang District, Rizhao City)

  Consultation time:

  Weekdays Morning: 8:30-11:30 Afternoon: 13:00-16:30

  


2022/03/24 15:13:38 393 Number